Price 3× more pours.
Hire no one.
Send your next drawing set. Get a QS-checked concrete & formwork take-off back in 24 hours — with every line shown, not a black-box number.
| Element | Conc. m³ | F'work m² | Reo t |
|---|---|---|---|
| Blinding (C15) | 18.4 | — | — |
| Pad footings | 62.1 | 148 | 4.8 |
| Ground beams | 44.7 | 392 | 6.1 |
| Slab on grade | 142.5 | 96 | 9.3 |
| Cols & walls | 38.9 | 514 | 7.7 |
| Susp. deck L1 | 168.2 | 1,240 | 14.2 |
| Total | 474.8 | 2,390 | 42.1 |
You're the estimator. That's the problem.
Every drawing set is an evening. Get the concrete volume or formwork area wrong and you either lose the job or lose your shirt on it. Hiring an estimator is dear and slow; the offshore lot send a number two days late with no working shown.
Take it off by hand — or gamble
- ✕Half a day per set; the owner is the bottleneck
- ✕Formwork contact area guessed — where margin leaks
- ✕Offshore bureau: black-box number, 48 hrs, re-checked anyway
- ✕Bids you'd have won, passed on for lack of time
Send drawings, get a checked take-off
- ✓Concrete m³ & formwork m² measured to your standard
- ✓A chartered QS checks it before it reaches you
- ✓Marked-up drawing shows every line measured
- ✓Back in 24 hours — price it while it's hot
What lands in your inbox
Everything you need to price the pour with confidence — and put your name to the number.
Concrete & formwork take-off
Volumes in m³ by grade, formwork contact area in m², blinding, screeds, joints — every quantity traced to a drawing reference.
Pour schedule
Element by element, grouped by pour, with the reo interface so your rebar sub and ready-mix order line up.
Marked-up drawing
The measured concrete drawn on the real drawing backdrop, colour-coded, legended. This is the working — no black box.
Live-formula Excel
Yellow inputs, green calculations. Change a rate, the tender number moves. Yours to keep and reuse.
Priced tender summary
Concrete, formwork and place/finish built up to a submittable number, with the rates exposed and labelled.
QS spot-check
A chartered QS reviews every pack against the drawings before it ships. That check is the guarantee — not a refund promise.
Just send the drawings. We do the rest.
Send a set
Upload your tender or IFC drawings — PDF is fine. One real, live job. No software to learn, no card.
We measure & check
The take-off is measured to your standard, then a chartered QS checks every line against the drawings.
Get the pack
Within 24 hours: take-off, pour schedule, marked-up drawing, priced summary and a numbered query list.
Cheaper than the estimator you can't hire
Your first take-off is free so you can judge it against your own hand. All prices in US dollars (USD).
Pay as you bid. Price scales with drawing size & complexity.
- Full checked pack, per job
- 24-hour turnaround
- No commitment
For firms bidding every week. Volume take-offs at one predictable price.
- Up to 15 take-offs / month
- Priority 24-hour turnaround
- Named QS reviewer
- Rolling rate library
White-label for estimating bureaus and multi-trade GCs.
- Unlimited / high volume
- White-label deliverables
- Multi-trade packages
- Dedicated line
Run associated trades in-house — rebar, groundworks, drainage? Talk to us about a combined take-off package so one drawing set prices your whole scope.
Combine tradesYour next take-off, free.
Send one real drawing set. We'll return a QS-checked concrete & formwork take-off in 24 hours — every line shown, and yours to keep whether you buy again or not.
Concrete throws off more problems than quantities.
If AI can measure your pours, it can help with the rest of the numbers too. These are live conversations, not products yet — if one's a headache for you, reach out.